top of page
  • Instagram
  • Twitter
  • LinkedIn
  • Youtube
Zoe Hemsley

New Contract Award - Alfreton, Nottingham

48-week student accommodation programme, set to complete Drainage (covering 2.4km), Substructure, and Concrete frame construction for the creation of three distinct Student Accommodation Blocks. Notably, the Alfreton Block will feature 8 suspended slabs, Highurst Block will integrate 5 suspended slabs, and the Spine Block will include 6 slabs, incorporating roofs. The collective floor area for these blocks will encompass a total of 23,300 square meters.


コメント


bottom of page