top of page
  • Instagram
  • Twitter
  • LinkedIn
  • Youtube

New Contract Award - Cornwall College

Construction of concrete frames for Buildings 1 and 2 will begin with the ground floor slab, carried out by others, to create two three-story buildings. These structures will include approximately 8,000m2 of suspended slabs, 350 columns, and 1,000m2 of traditional walls. All slabs will use BAMTEC rollmat reinforcement, as designed by the client.



bottom of page