New Contract Award - Cornwall College
Construction of concrete frames for Buildings 1 and 2 will begin with the ground floor slab, carried out by others, to create two three-story buildings. These structures will include approximately 8,000m2 of suspended slabs, 350 columns, and 1,000m2 of traditional walls. All slabs will use BAMTEC rollmat reinforcement, as designed by the client.



