Holyrood Student Accommodation, Edinburgh

Completion Date: March 2014 (South) / May 2015 (North)

Location: Edinburgh, Scotland


Client - University of Edinburgh

Main Contractor - Balfour Beatty

Architect - Richard Murphy Architects (South) / JM Architects (North)

Engineer - Buro Happold (South) / Blyth & Blyth (North)


Project Overview

Back in 2012, our team delivered the groundworks and reinforced concrete (RC) frame for a major student-accommodation project in Edinburgh. From early excavation right through to the topped-out structural frame, we laid the physical and engineering foundations of a facility creating great student living spaces.


Stephenson Group Contribution

Stephenson Group’s scope included:

  • Full works on the groundworks: excavation, piling, sub-structure – setting the building safely into its site.

  • Delivery of the RC frame: the reinforced concrete skeleton, providing the structural stability, floor-to-floor continuity and load-bearing capacity for the building.

  • Close collaboration in sequencing and logistics to ensure that sub-structure and super-structure evolved smoothly, minimizing risk and maintaining timeline integrity.


Why this matters

Our early structural work ensured:

  • A strong, durable base for years of student-use ahead

  • A seamless transition from groundwork to frame enabling efficient overall delivery

  • That the building could accommodate the architectural and operational aspirations of the client with confidence